Half Year Results 2017

Highlands Posts Solid Result

A strong operating performance at the Ramu Nickel / Cobalt mine, coupled with significantly reduced corporate overheads and administrative expenses, have enabled Highlands Pacific Limited (ASX: HIG) to report a net profit of US$1.46 million for the six months to June 2017 (2016: US$23.6 million loss).

Download link to the copy of this announcement is below.

2017 Half Year Financial Report

Ramu NiCo – Mineral Resources and Ore Reserves 2016

Following are the statements of Mineral Resources and Ore Reserves for the Ramu Nickel Mine as at 31 December 2016, reported under The JORC Code, 2012 Edition.

The reports were prepared for and are the responsibility of Ramu NiCo Management (MCC) Limited, the operator and manager of the Ramu Nickel/Cobalt Laterite Mine.

Download link to the copy of this announcement is below.

Rpt of Ramu NiCo__ Mineral Resources Estimate 2016(Final Report)-03072017

1 2 3 6